Module 2: Production & Grading
Convert raw stone boulders into Crush, Chips, Khaka, Shingle/Mulba, and Graded Stone.
Production Batch Logs & Yield History
2 batches processed| Batch No | Date | Raw Used | Crush Output | Chips Output | Khaka | Shingle/Mulba | Stone | Waste Loss | Operator |
|---|---|---|---|---|---|---|---|---|---|
| PRD-20260712-B | 2026-07-12 | 120.0 T | 75.0 T | 26.0 T | 13.0 T | 4.0 T | 0.0 T | 2.0 T | Shift B - High Crush Demand Batch |
| PRD-20260711-A | 2026-07-11 | 100.0 T | 55.0 T | 23.0 T | 12.0 T | 6.0 T | 2.0 T | 2.0 T | Shift A - Primary & Secondary Crusher Run |